Skip links
Program

Themes

Main Theme : “Smart and Sustainable Management of Rural Resources”
Program

Program

23 October ~ 25 October
Program

Floor Plan

Technical Tour 1

Ipgok Reservoir

Location
Ipgok-ri, Sanin-myeon, Haman-gun, Gyeongsangnam-do

Purpose
The Ipgok Reservoir was constructed as an agricultural water source, and it boasts a considerable size, so large that you cannot see the ends of it. To the left of the reservoir, there is a pine forest on steep cliffs, while to the right, deciduous and coniferous forests on gentle slopes create a beautiful harmony. This area, with its numerous small and large hills forming a valley around the reservoir, preserves a variety of colorful rocks and rocky cliffs, along with its enchanting natural scenery, and holds legends, adding to its mystique. As you enter the reservoir park entrance, the shimmering reservoir catches your eye first. Crossing a suspension bridge, 112 m long and 1.5 m wide, that spans the center of the reservoir, the walking trail around the reservoir is truly exceptional. Bird feathers stretch out gracefully on the water's surface, and various unnamed flowers and trees surround the reservoir and the walking trail. Occasionally, white herons flaunt their magnificent figures, making it truly picturesque.

Reservoir specifications
- Watershed area: 976.0 ha
- Benefited area: 232.2 ha
- Total Reservoir capacity: 600.3 1,000m3
- Reservoir height & length: 13.8 m & 149.0 m

Ipgok
Agricultural reservoir
National park
Technical Tour 2

Clean Water Supply Project
(Changwon Deulnyeok)

Location
Daesan-myeon, Uichang-gu, Changwon-si, Gyeongsangnam-do

Purpose
The Clean Water Supply Project aims to provide treated clean water to areas where greenhouse-grown vegetables and crops are cultivated, promoting safe agricultural practices and increasing farmers' income through the production of high-quality agricultural products.

Clean water project specification
- Project period: 2011 ~ 2024
- Applied area: 883 ha (Zone 1: 383 ha, Zone 2: 500 ha
- Major construction: Water
treatment & Booster pump, Pipeline (81.2 km)
- Total project cost: KRW 270 billion (Zone 1: KRW 100 billion, Zone 2: KRW 170 billion)
- Project implementer: Changwon Mayor
(Delegation to Rural Development Administration Changwon Branch)

Clean water project
Pipeline Irrigation
Changwon-si